Electric Energy Measurement for Remote Management in Low Voltage

Open core transformers. you do not need shutdown existing installations, enable transformer measure current without needing to interrupt the supply, making the assembling easier.

  • Transformer ratio 1200/5.
  • Sealable plastic cover, fixing base and bus-bar.
  • Certificate model for pricing.
Contact us

    Name (required)

    Lastname (required)

    Email (required)

    Company (required)

    Select your Country*

    Your message (required)

    This site is protected by reCAPTCHA and the Google
    Privacy Policy and
    Terms of Service apply.